OPS 571 Week 1 Practice 100% Correct (All Possible Question/Answer)

 

The Tuff Wheels was getting ready to start its development project for a new product to be added to their small motorized vehicle line for children. The new product is called the Kiddy Dozer. It will look like a miniature bulldozer, complete with caterpillar tracks and a blade. Tuff Wheels has forecasted the demand and the cost to develop and produce the new Kiddy Dozer. The table below contains the relevant information for this project.

           

 

 

System integration and validation are an important step in which variant of the generic product development process?

 

 

 

 

 

                                Operation Management 571

Part 2 Practice week 1

Similarity of projects allows for a streamlined and highly structured development process in which variant of the generic product development process?

 

Technology-push products

 

Customized products

 

Complex systems

 

Quick-build products

 

Process-intensive products

 

 

Quality function deployment (QFD):

 

Is a manufacturing function aimed at lowering cost by reducing the portion of rejected units.

 

Fills the house of quality matrix with the designer’s aspirations for the product.

 

Starts with studying and listening to customers.

Is a place where the quality assurance function is housed.

 

Is another term for value engineering.

 

 

 

Simplify products and processes

 

 

                                Operation Management 571

Part 2 Practice week 1

What dimension of competitiveness does time-to-market performance in product design and process selection affect?

 

 

                                Operation Management 571

Part 2 Practice week 1

The most basic categories of cash flow for a typical new product do not include:

 

 

 

Advocates of financial modeling of product design projects argue that:

 

Financial analysis focuses on measurable quantities only.

 

Financial analysis brings discipline and control to the product development process

 

Sufficiently rigorous financial analysis can accurately forecast the product’s profit potential.

 

Financial analysis is as solid as the assumptions that go into the model.

Financial analysis nurtures innovation and creativity.

 

 

 

 

OPS 571-Week 1 practice questions

Match the following product types to the appropriate product development description.

 

 

Explanation

Descriptions of the product development process for these different types of products are summarized in Exhibit 3.2 in the text.

 

2. A process that emphasizes cross-functional integration and concurrent development of a product and its associated processes is known as ___________. (Choose the correct answer to fill in the blank.)

 

 

Explanation: Product design engineers and manufacturing process planners work together in the process known as concurrent engineering to ensure that the product is designed in a way that it can be produced by the firm. Any needed changes to the processes can be planned for and put in place when production is scheduled to begin.

 

3.  Measures of product development success can be organized in what three categories?

 

 

Explanation: The categories and specific examples of measurements are provided in Exhibit 3.11 in the text.

4.  Concept development assumes a proven technology in which variant of the generic product development process?

 

 

5.   System integration and validation are an important step in which variant of the generic product development process?

 

 

6.  A reason that firms must develop more new products than ever is which of the following?

 

 

Explanation: Because the number of new products has increased while model lives and life cycles have shrunk, firms must mount more development projects than previously, and these projects must use substantially fewer resources per project.

 

 

 

7.  Design for manufacturing and assembly delivers product improvements by emphasizing which of the following?

 

Explanation: The greatest improvements related to DFMA arise from simplification of the product by reducing the number of separate parts.

 

8.  Advocates of financial modeling of product design projects argue that:

           

Explanation: Financial modeling and sensitivity analysis are powerful tools for supporting product development decisions, but these techniques have important limitations. Many argue that rigorous financial analyses are required to bring discipline and control to the product development process. Others argue that financial analysis only focuses on measurable quantities and that it is often extremely difficult to predict these values accurately.

 

9. Sensitivity analysis of the base-case financial model is a useful tool for which of the following reasons?

           

10. Performance measures discussed for development projects does not include

           

Explanation: Seemeasuring product development performance discussion.

 

 

 

Week 1 Quizzes

The first step in developing a house of quality is to develop a list of _____________. (Choose the correct answer to fill in the blank.)

Multiple Choice

•          

customer requirements for the product

Correct

•          

rooms in the house

•          

team members

•          

major parts and components of the product

•          

major vendors

Explanation

The focus of the house of quality is the customer, so developing a list of the customers’ requirements for the product is a logical first step

Show my answersExplanation

Item 2

Item 2 0 of 2 points awarded Item Scored

The Tuff Wheels was getting ready to start its development project for a new product to be added to their small motorized vehicle line for children. The new product is called the Kiddy Dozer. It will look like a miniature bulldozer, complete with caterpillar tracks and a blade. Tuff Wheels has forecasted the demand and the cost to develop and produce the new Kiddy Dozer. The table below contains the relevant information for this project.

 

 

 

Tuff Wheels also has provided the project plan shown below. As can be seen in the project plan, the company thinks that the product life will be three years until a new product must be created.

 

 

 

 

 

Assume all cash flows occur at the end of each period.

 

a. What is the net present value (discounted at 8%) of this project? Consider all costs and expected revenues. (Enter your answer in thousands of dollars. Perform all calculations using Excel. Do not round any intermediate calculations. Round your answer to the nearest thousand.)

 $8,336

 

 

b. What is the impact on NPV for the Kiddy Dozer if the actual sales are 50,000 per year? 70,000 per year? (Enter your answer in thousands of dollars. Perform all calculations using Excel. Do not round any intermediate calculations. Round your answer to the nearest thousand.)

NPV 50,000 $6,627

NPV 70,000 $10,046

 

c. Based on the original sales level of 60,000, what is the effect on NPV caused by changing the discount rate to 9%, 10%, or 11%? (Enter your answer in thousands of dollars. Perform all calculations using Excel. Do not round any intermediate calculations. Round your answer to the nearest thousand.)

 

 

Measures of product development success can be organized in what three categories?

Multiple Choice

•          

Time to market, productivity, and quality

Correct

•          

Timeliness, quality, and cost

•          

Speed, cost, and effectiveness

•          

Cost, quality, and speed

•          

Efficiency, effectiveness, and value

Explanation

The categories and specific examples of measurements are provided in Exhibit 3.11 in the text.

 

 

 

 

System integration and validation are an important step in which variant of the generic product development process?

Multiple Choice

•          

Technology-push products

•          

Customized products

•          

Complex systems

Correct

•          

Quick-build products

•          

Process-intensive products

Explanation

See Exhibit 3.2.

Which of the following is a characteristic of concurrent engineering?

Multiple Choice

•          

Integrated computer-assisted design

•          

Using automated guided vehicles

•          

Separate development teams working at once

Correct

•          

Having an excellent forecasting system

•          

The design-build-test cycle

Explanation

Detail design of the components is a highly parallel process, often referred to as concurrent engineering, with many separate development teams working at once.

 

Quality function deployment (QFD):

Multiple Choice

•          

Is a manufacturing function aimed at lowering cost by reducing the portion of rejected units.

•          

Fills the house of quality matrix with the designer’s aspirations for the product.

•          

Starts with studying and listening to customers.

Correct

•          

Is a place where the quality assurance function is housed.

•          

Is another term for value engineering.

Explanation

The QFD process starts with studying and listening to customers to determine the characteristics of a superior product.

The purpose of value analysis/value engineering (VA/VE) is to:

Multiple Choice

•          

Simplify products and processes

Correct

•          

 

Explanation

The purpose of value analysis/value engineering (VA/VE) is to simplify products and processes.

Economic analysis of product development projects is useful in which of the following circumstances?

Multiple Choice

•          

Factory location

•          

Distribution decisions

•          

Go/no-go milestones

Correct

•          

Demand estimation

•          

Pricing

Explanation

Economic analysis is useful in at least two different circumstances:

1.         Go/no-go milestones.

2.         Operational design and development decisions.

 

 

 

The most basic categories of cash flow for a typical new product do not include:

Multiple Choice

•          

 

Explanation

The most basic categories of cash flow for a typical new-product-development project are:

 

 

 

 

 

 

What dimension of competitiveness does quality in product design affect?

Multiple Choice

•          

Engineering hours per project

•          

The cost of ongoing service

Correct

•          

Responsiveness to customer needs

•          

Aesthetics of design

•          

None of these

Explanation

SeeMeasuring product development performance discussion..

 

 

WEEK 1 EXAM RESULTS/ most answers

In the generic product development process, phase 2 (system-level design) begins with corporate strategy and incorporates market objectives.

False

 

Concept development is one of the typical phases of product development.

True

 

Most purchasers of electronic products cannot fully operate them and use only a small number of the available features

True

Economic analysis of product development projects must evaluate which of the following?

Multiple Choice

•          

Planned profitability of the product

•          

Expected market share to be attained

•          

Net present value of profits

•          

Timing and amount of net cash flow

Correct

•          

Demand elasticity of the product

 

Which of the following is not an example of technology –push product?

Multiple Choice

•          

Gore-tex

•          

Artificial vein

•          

plant seeds

Correct

•          

I-phone 7

•          

Go-pro Camera

 

Which of the following is not a typical phases of product development?

Multiple Choice

•          

Concept development

•          

Planning

•          

System-level design

•          

early market feedback

Correct

•          

Production/ramp-up

 

Consumer electronics is an example of a product developed in which variant of the generic product development process?

Multiple Choice

•          

Technology-push products

•          

Customized products

•          

Platform products

•          

Quick-build products

Incorrect

•          

Process-intensive products

 

 

Because ecodesigned products are innovative and have better environmental performance, they can be of a slightly lesser quality than the market standard.

False

 

 

 

 

Performance measures discussed for development projects does not include

Multiple Choice

•          

Frequency of new product introductions

•          

Yield

•          

Percentage sales coming from very old products

Correct

•          

Cost of materials and tooling

•          

conformance – reliability in use

 

Specialized design firms tend to have highly developed processes that support the needs of particular industries.

True

Quality function deployment involves listening to customers to determine the characteristics of a superior product.

True

One of the major benefits of DFMA is that products are designed that customers will want.

False

A key decision point in the generic development process during “Phase 1: Concept Development” is project approval.

False

 

Sensitivity analysis of the base-case financial model is a useful tool for which of the following reasons?

Multiple Choice

•          

To determine how long the development process can profitably last

•          

To understand how many technical people are needed to make the project a success

•          

To help understand the basic trade-offs of resources committed and cash received

Correct

•          

To identify the necessary product launch date

•          

To set marketing and sales budgets

 

Incorporation of environmental considerations in the design and development of products or services is called ecodesign.

True

A key tool of a quality function deployment team is the house of quality matrix.

True

A key decision point in the generic development process during “Phase 4: Testing and Refinement” is concept approval.

False

DFMA stands for design for manufacturing and assembly.

True

The generic development process outlined in the textbook is followed by many, if not most, of the firms in the Fortune 500.

False

 

Similarity of projects allows for a streamlined and highly structured development process in which variant of the generic product development process?

Multiple Choice

•          

Technology-push products

•          

Customized products

Correct

•          

Complex systems

•          

Quick-build products

•          

Process-intensive products

 

 

A competency is not core if it is easy for competitors to imitate.

True

 

What dimension of competitiveness does quality in product design affect?

Multiple Choice

•          

Engineering hours per project

•          

The cost of ongoing service

•          

Responsiveness to customer needs

•          

Aesthetics of design

Incorrect

•          

None of these

 

The purpose of value analysis/value engineering (VA/VE) is to:

Multiple Choice

 

 

A reason that firms must develop more new products than ever is which of the following?

Multiple Choice

•          

patents and trade names

 

Core competencies are those things that everyone in the firm must be able to do well.

False

 

 

OPS 571-Week 1 practice questions

Match the following product types to the appropriate product development description.

 

 

Explanation

Descriptions of the product development process for these different types of products are summarized in Exhibit 3.2 in the text.

 

2. A process that emphasizes cross-functional integration and concurrent development of a product and its associated processes is known as ___________. (Choose the correct answer to fill in the blank.)

 

 

Explanation: Product design engineers and manufacturing process planners work together in the process known as concurrent engineering to ensure that the product is designed in a way that it can be produced by the firm. Any needed changes to the processes can be planned for and put in place when production is scheduled to begin.

 

3.  Measures of product development success can be organized in what three categories?

 

 

Explanation: The categories and specific examples of measurements are provided in Exhibit 3.11 in the text.

4.  Concept development assumes a proven technology in which variant of the generic product development process?

 

 

5.   System integration and validation are an important step in which variant of the generic product development process?

 

 

 

6.  A reason that firms must develop more new products than ever is which of the following?

 

 

Explanation: Because the number of new products has increased while model lives and life cycles have shrunk, firms must mount more development projects than previously, and these projects must use substantially fewer resources per project.

 

 

 

7.  Design for manufacturing and assembly delivers product improvements by emphasizing which of the following?

nt

Explanation: The greatest improvements related to DFMA arise from simplification of the product by reducing the number of separate parts.

 

8.  Advocates of financial modeling of product design projects argue that:

 

Explanation: Financial modeling and sensitivity analysis are powerful tools for supporting product development decisions, but these techniques have important limitations. Many argue that rigorous financial analyses are required to bring discipline and control to the product development process. Others argue that financial analysis only focuses on measurable quantities and that it is often extremely difficult to predict these values accurately.

 

9. Sensitivity analysis of the base-case financial model is a useful tool for which of the following reasons?

 

Explanation: Sensitivity analysis uses the financial model to answer “what if” questions by calculating the change in NPV corresponding to a change in the factors included in the model.

 

10. Performance measures discussed for development projects does not include